Skip to main content

How to Construct, And what is construction in 12 Steps

 Hey guys Welcome to Craft & Knowledge 


12 steps of construction



once the construction drawings and other related documents have been completed and approved by the authority in jurisdiction the project will then be awarded to a contractor by the client through a consultant in this period the construction of the proposed project will begin construction can be summarized into 12 stages.


No.01

clearing of the ground to begin the actual construction the clearing of the ground from where the location of the project will be built as the first thing to consider the construction personnel task is to free the construction site for any obstruction and debris that may obstruct and delay the construction the temporary facilities such as engineers office labor's quarter material storage room temporary water and electric supplies and other related facilities should also be constructed prior to the start of work a site perimeter fence should also be constructed during this period


No.02

site layout and staking this activity involves the setting of the reference points in a form of construction grid lines and marking off the gate level this is performed to ensure that the grids have been set up on site according to approved plans the reference point should be marked properly and should not be disturbed throughout the course of the construction grid lines according to the approved drawing should be layout prior to construction depending on the complexity and size of the project the construction grids can be layout through the use of theodolite or related surveying instruments a more traditional way of the layout of the construction grid is popular to use for small projects is through staking using batter board and strings batter board or temporary wooden frames used to suspend the strings the strings are the representation of the grid lines at x and y directions according to approved plans these will serve as a guide throughout the construction so it is important to fix a reference line in both directions to be used once the grids have been placed when needed in the construction


No.03

excavation once the layouts of construction points and grid lines have been completed the excavation works begin the excavation depth depends on the recommendation by the soil investigation report but it is safe to say that the minimum excavation level for the footing to rest should stick to one meter below the gate level or the 0.00 level excavation works as a massive activity therefore a proper caution should be observed during this stage in the event that the excavation needed is along with the neighbor's existing structure exceeding 1.20 meter from your proposed level then shoring support is recommended.


No.04

compacting and laying of pcc compacting of the excavated surface should perform once we reach the desired excavation level a layer of crushed gravel is then to be added during the compacting in a standard compaction procedure the final compacted layers should be checked in order to reach the desired degree of compaction to not less than 95 of the maximum dry density it is then in this stage that an anti-termite treatment on the ground should also be considered the laying of pcc or plane concrete cement should follow afterward in preparation for rebar works pcc is usually composed of a 10 millimeters thick lean concrete for the footing rebar to be laid evenly level.


No.05

foundation rebar and column starter bars once the laying of pcc has been set up the rebar works for foundation and any foundation beams are the next activity in this stage the reinforcement of foundations is being prepared according to the structural schedule along with its formworks the proper and standard concrete cover should be observed during this procedure starter bars for columns should also be installed accordingly before concrete pouring


No.06

concreting of foundations and column rebar installation concreting of foundations has to come next after the rebar works the concrete to be poured should be properly vibrated for the concrete especially the aggregates to fully spread into the footing installation of column reinforcement on the previously installed column starter bars should be continued a proper concrete cover should consider before closing the form works for substructure columns an additional concrete cover of at least 50 millimeters has to be considered up to plinth level to protect the rebar for possible corrosion due to sulfate attack.


No:07

concreting of column and bitumen paint applications once the concreting of stub columns has been completed give time for the concrete to dry completely and apply at least two coats of bitumen paint for both footing and stub columns bitumen paint helps in absorbing moisture due to the soil to prevent seepage into the substructure concrete.


No:08

 setting up perimeter blocks install solid blocks along the perimeter or the edge of the proposed project this is to establish a boundary between the inside and outside edges of the project it is also helpful when the difference of inside floor finish level to outside pavement or ground level is significant two coats of bitumen paints should also apply afterward in some cases perimeter blocks are optional especially for areas where the soil characteristics are too firm.


No:09

backfilling and compacting once the substructures like foundation structures including the solid blocks have been installed completed backfilling and compacting should take place backfilling and compacting should be done partially to make sure that the required degree of compacting has been met until reaching the bottom of the tie beam level


No:10

tie beam reinforcement grade slap and concreting preparation and installing the thai beam reinforcement as per the approved drawing is the next step to consider after the backfilling and compacting formworks with standard concrete cover are also included in this stage once the reinforcement works have been completed we can start the concreting installing of grade slab mesh in concrete work is then to be followed.


No:11

rebar works and concreting of columns at this stage the substructure component of our project has been completed it is now time for the project to go up the next thing to consider as the rebar works shuttering or formworks and concreting to be done prior to concreting we see to it that the columns followed the structural schedule the form works should be vertically level in a standard concrete cover has to maintain prior tothe closing of forms.


No:12

 beam and slab works once the ground floor columns have been cast it is time to prepare the project for beams and suspended slab reinforcement activity like any other structural member's beams,


and slab reinforcement should be followed strictly shuttering or form works for slab and beams should be properly anchored and checked prior to concrete pouring step 11can be repeated accordingly until such time that the structural frame or the core and shell of the structure has been completed the architectural finishing works are then be followed.


Comments

Popular posts from this blog

Civil Engineering - Discipline

Hey guys Welcome to Craft & Knowledge. We are going to discuss about introduction to Civil Engineering in this topic here. We are going to discuss about sub disciplines of civil engineering before that you must know the definition about civil engineering and civil engineer Heuvel engineering is a professional engineering discipline that deals with the design construction and maintenance of the physical and naturally built environment including public works such as roads bridges canals dams yak boats sea wage system pipelines structural components of buildings and railways civil engineering is one of the oldest engineering discipline in the field of engineering,   Civil Engineering involves the planning designing constructing maintaining and supervising infrastructures which include facilities essential to modern life like highways bridges and tunnels schools hospitals Yap ports and other buildings Seaway system and water treatment facilities, Who is civil engineer? Wh...

Construction Industry – Updated for 2022

Here Is Presenting by The Real Construction.  Construction Industry – Updated for 2022 We really appreciate content about the construction industry that’s interesting, helpful, and teaches us a thing or two that we didn’t know beforehand. Here is our new list of  11 essential construction industry blogs for 2022  (and beyond!) that should be interesting to anyone in the industry, whether you’re out in the field or killing it in the office. Table of Contents 11 essential blogs for the construction industry 11. Fieldwire Blog 10. Federal Construction Contracting Blog by Cohen Seglias 9. Digital Builder by Autodesk 8. LetsBuild (formerly GenieBelt) 7. The eSUB Blog 6. Construction Business Owner 5. For Construction Pros 4. Construction Dive 3. Construction Executive 2. The Jobsite by Procore 1. Levelset’s Construction Payment Blog 11 essential blogs for the construction industry Before we get started, a mild disclaimer of sorts: Not ...

Air India, My experience with Air India

 Make air india great again that's tata's mission after the takeover in 2022.  the indian flag carrier was once known as the very best airline in the world setting standards across the world in terms of service and comfort, it even became the very first airline to feature an old jet fleet in 1962 being the world's most profitable airline but over the years the mara raja started to struggle mainly due to mismanagement poor decision making and the introduction of other airlines slowly but surely her india turned into a national embarrassment with poorly maintained planes and state employees were rather flying for the benefits instead of the passion of aviation sucking the blood out of the maharaja in january 2022 tata is taking over control again, and there is no doubt that indians have high hopes that it will turn the airline around reaching new heights so i went to india to inspect the airline myself and see whether there is a new spirit among the staff so please join me on...