Construction of RCC -DESIGN at Home

 



🥰Hey Guys Welcome Back to the Craft and Knowledge, In today's Article we'll explore some innovative, 



Such as a Construction Of Rcc Design.


Construction of rcc building required some of paperwork before the start of actual construction the very first stage is preparation of drawings as per requirements of client once drawings are completed approval of drawings is important after approval of drawings from both architect as well as structural engineer the next step is marking of plot boundaries cleaning of plot,


Site preparation consists of clearing away the trees from your building site this involves the removal of trees roots and other vegetation from the building site after cleaning the side plot marking of plot should be done as per drawings excavation a structural engineer will be needed to determine the depth of the excavation the depth will vary as per building depending upon soil,


 Strata excavation should be carried out as per the drawings defined lengths and widths excavation is to be done by the jcb pcc after the excavation the surface is leveled pcc poured over leveled surface foundation shuttering shuttering arrangement for foundation is to be made once pcc is done shuttering for a foundation is placed it should be strong,


Enough to withstand all types of dead and lived loads foundation bars foundation bars shall be laid on the surface main bars and distribution bars show places per drawing column bars proper arrangement to be made for column bars with links as per drawings column steel and foundation steel to be tied properly to avoid joint cracks reinforcement,


Shall be as per bar bending schedule prepared according to drawing the reinforcement shifting and binding shall be started as soon as shuttering is completed reinforcement binding shall continue as shuttering work as progresses concrete work and foundation a foundation is a port concrete pathway that is used to spread the weight of the building from the foundation to the soil,


It is very necessary to check the levels of foundation before concrete work depth of foundation varies from 1.5 to 2 meters shuttering removal the formwork removal procedure should be supervised by the engineer to ensure that quality of hardened concrete and structural member that is it should be free from or has minimum casting defects such as honeycombing size and shape defects etc,


These defects in concrete influence the strength and stability of structure thus immediate repair works can be done or the members can be rejected back filling once the foundation is completed backfill the remaining excavated area around foundation with soil backfill provides stability to the building gear trademark s foundation beam reinforcement,


 Shall be as per drawings top bars bottom bars and stirrups to be placed with proper development length joints in the beam shuttering should be tight against leakage of cement grout construction of shuttering should permit removal of various parts and desired sequences without damage to the concrete beam concreting beam is poured with concrete with grade mentioned in the drawings,


The positioning of reinforcement should be properly aligned shattering parts and connections should be arranged in a way that makes formwork removal easy and simple prevents damage to concrete and form work panels so that it can be reused without extensive repair slab concreting great slab requires no reinforcement as it's resting on ground strata itself top of plinth beams,


 And great slabs should be at the same level column shuttering column shuttering should be rigidly constructed and efficiently propped and braced both horizontally and vertically so as to retain its shape the shuttering should be set accurately to the desired line,


 And levels should have plain surface column concreting after the concreting of footing is complete immediately in a day or two starters for a column should be casted with proper alignment columns of very important members in rcc design wrong placing of column may affect the overall behavior of structure,


 Concreting of rcc columns should start from the center of vertical bars and go towards the ends column shuttering removal shuttering should not be removed until the concrete has developed sufficiently strength to support all loads placed upon it the separation of forms should not be done by forcing it may damage the hardened concrete beam reinforcement beam reinforcement shall be as per drawings slab reinforcement,



Slab reinforcement shall be as per drawings main bars and distribution bars shall be placed as per design slab reinforcement should be properly anchored with beam bars slab shuttering beam bottom is first laid on the column and then slab shuttering is laid beam,


 Beam and slab levels should be maintained as per drawing slap concreting after the concreting of column beam and slab concreting shall start monolithically the top of floor beam and slab shall be maintained as per levels slab,


 Shuttering removal special attention is required for shuttering removal of flexible members such as beams and slabs as these members are subjected to cell float as well as live load even during construction they may deflect if the strength gained is not sufficient to handle to loads shuttering should not be removed until the concrete has developed sufficiently hardness.


        🥰 Thanks for Coming🥰

Comments

Popular posts from this blog

Construction Industry – Updated for 2022

Here Is Presenting by The Real Construction.  Construction Industry – Updated for 2022 We really appreciate content about the construction industry that’s interesting, helpful, and teaches us a thing or two that we didn’t know beforehand. Here is our new list of  11 essential construction industry blogs for 2022  (and beyond!) that should be interesting to anyone in the industry, whether you’re out in the field or killing it in the office. Table of Contents 11 essential blogs for the construction industry 11. Fieldwire Blog 10. Federal Construction Contracting Blog by Cohen Seglias 9. Digital Builder by Autodesk 8. LetsBuild (formerly GenieBelt) 7. The eSUB Blog 6. Construction Business Owner 5. For Construction Pros 4. Construction Dive 3. Construction Executive 2. The Jobsite by Procore 1. Levelset’s Construction Payment Blog 11 essential blogs for the construction industry Before we get started, a mild disclaimer of sorts: Not ...

How to Loss Your Weight, English / Urdu

 Exercise to loss weight  If somebody told you without delay what absolutely the best exercise to lose weight was, would you are doing it? you may after you browse this. Drum roll, please! The best exercise to thin is: "the exercise you'll do," says Timothy Church, MD, MPH, PhD, a prof at Pennington medicine center in Baton Rouge, La. Other consultants interviewed by WebMD aforesaid abundant identical factor concerning weight loss workouts. "The 2 things that stop individuals from losing weight with exercise ar either tedium or injury," says healer and strength and acquisition specialist mount Quist, PhD, NSCA. The truth is that weight  loss is concerning making a calorie deficit -- in alternative words, burning a lot of calories than you're taking in. So, they say, whereas running at AN 8-minute-mile pace may well be a good calorie burner, if you are not progressing to couple, it is not progressing to assist you. Instead, begin with one thing you'll do,...

Construction of RCC -DESIGN at Home in Urdu/hindi

 🥰ارے دوست، ہنر اور علم میں واپس خوش آمدید، آج کے آرٹیکل میں ہم کچھ اختراعات کو دریافت کریں گے،  جیسا کہ آر سی سی ڈیزائن کی تعمیر  آر سی سی بلڈنگ کی تعمیر کے لیے اصل تعمیر کے آغاز سے پہلے کچھ کاغذی کارروائی کی ضرورت ہوتی ہے بالکل پہلا مرحلہ کلائنٹ کی ضروریات کے مطابق ڈرائنگ کی تیاری ہے ایک بار جب ڈرائنگ مکمل ہو جاتی ہے تو ڈرائنگ کی منظوری آرکیٹیکٹ کے ساتھ ساتھ سٹرکچرل انجینئر دونوں سے ڈرائنگ کی منظوری کے بعد ضروری ہوتی ہے۔  مرحلہ پلاٹ کی حدود کی نشان دہی ہے پلاٹ کی صفائی،  سائٹ کی تیاری آپ کی عمارت کی جگہ سے درختوں کو صاف کرنے پر مشتمل ہوتی ہے اس میں عمارت کی جگہ سے درختوں کی جڑیں اور دیگر پودوں کو ہٹانا شامل ہے سائیڈ پلاٹ کی صفائی کے بعد پلاٹ کی نشانی کھدائی کے ڈرائنگ کے مطابق کی جانی چاہیے کہ اس کا تعین کرنے کے لیے ایک اسٹرکچرل انجینئر کی ضرورت ہوگی۔  کھدائی کی گہرائی مٹی کے لحاظ سے عمارت کے لحاظ سے مختلف ہوگی،   سطح کی کھدائی طے شدہ طول و عرض اور چوڑائی کے خاکوں کے مطابق کی جانی چاہئے کھدائی jcb pcc کے ذریعہ کی جانی چاہئے کھدائی کے بعد سطح کو برابر...